BORDA APPLICATION OF SELECTION PLANNING SCHEDULING METHOD IN DOCK ENGINEERING CONSULTANTS IN CENTRAL SULAWESI PROVINCE INDONESIA

Download This Article

Siti Fatimah, Ahmad Laongko, Muzakir Tombolotutu

https://doi.org/10.22495/cbv11i1c1art5

Abstract

The aim of this paper to find out the planning scheduling method that used in dock engineering consultants as a project supervisor dock. This research use qualitative approach to find the most preferred method by engineering consultants, this research was explorative that test and find out the most preferred method. This research showed that dock engineering consultants in Palu City, Central Sulawesi most preferred curve-s method than method such as CPM, PERT, PDM, and Bar Chart. This research can help further research to determine differences and similarities the project planning scheduling method and being basic for The New Dock Engineering Consultans. This research looking for the most preferred method with limited respondents dock engineering consultans in Palu City, Central Sulawesi.

Keyword: CPM, PERT, PDM, S-Curve, Bar Chart, Free Flat

How to cite this paper: Fatimah, S., Laongko, A., & Tombolotutu, M. (2015). Borda application of selection planning scheduling method in dock engineering consultants in Central Sulawesi province Indonesia. Corporate Board: role, duties and composition, 11(1-1), 131-136. https://doi.org/10.22495/cbv11i1c1art5